<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"><channel><title>Magnitude Electronics</title><description>Independent guides to electronic components, sourcing evidence, power supplies and industrial control interfaces for engineers and equipment buyers.</description><link>https://magnitude-electronics.com/</link><item><title>Read a Capacitor Derating Chart: Voltage Limits and Effective Capacitance</title><link>https://magnitude-electronics.com/blog/capacitor-derating-chart-voltage-capacitance/</link><guid isPermaLink="true">https://magnitude-electronics.com/blog/capacitor-derating-chart-voltage-capacitance/</guid><description>A voltage-limit curve and a capacitance-change curve answer different questions. Record the ordering-code chart, and leave every unknown cell blank.</description><pubDate>Wed, 14 Oct 2026 00:00:00 GMT</pubDate></item><item><title>Conformal Coating Rework: Verify Removal, Cure State and Repair Material</title><link>https://magnitude-electronics.com/blog/conformal-coating-rework-compatibility-review/</link><guid isPermaLink="true">https://magnitude-electronics.com/blog/conformal-coating-rework-compatibility-review/</guid><description>Match the named coating, cure state, removal file and repair material before a local patch. If the product or cure state is unknown, leave those cells blank and stop.</description><pubDate>Wed, 14 Oct 2026 00:00:00 GMT</pubDate></item><item><title>What Is the Shelf Life of ICs? Storage, Floor Life, and Acceptance</title><link>https://magnitude-electronics.com/blog/ic-shelf-life-storage-floor-life-acceptance/</link><guid isPermaLink="true">https://magnitude-electronics.com/blog/ic-shelf-life-storage-floor-life-acceptance/</guid><description>An old IC date code is not a scrap or release decision. Separate sealed-bag storage evidence, opened-bag floor life, and the buyer&apos;s acceptance terms, then name the missing record.</description><pubDate>Mon, 12 Oct 2026 00:00:00 GMT</pubDate></item><item><title>Review an Electronics PCN: Affected Parts, Revisions and Dates</title><link>https://magnitude-electronics.com/blog/electronics-pcn-affected-parts-review/</link><guid isPermaLink="true">https://magnitude-electronics.com/blog/electronics-pcn-affected-parts-review/</guid><description>Read a component PCN as an evidence review: confirm the revision, get the full affected-parts list, match exact ordering codes and keep each date separate.</description><pubDate>Sun, 11 Oct 2026 00:00:00 GMT</pubDate></item><item><title>Decoding &apos;Ex db IIB+H2 T4 Gb&apos;: Emerson QX1400 Marking Boundaries</title><link>https://magnitude-electronics.com/blog/emerson-qx1400-hazardous-area-certified/</link><guid isPermaLink="true">https://magnitude-electronics.com/blog/emerson-qx1400-hazardous-area-certified/</guid><description>Read the QX1400 announcement markings by field. Separate reported ATEX and IECEx certification from expected North American approval and site acceptance.</description><pubDate>Fri, 09 Oct 2026 00:00:00 GMT</pubDate></item><item><title>Can Han Size 4 Replace Han 6? What HARTING Has Actually Announced</title><link>https://magnitude-electronics.com/blog/harting-han-4-connector/</link><guid isPermaLink="true">https://magnitude-electronics.com/blog/harting-han-4-connector/</guid><description>Assess Han Size 4 as a Han 6 replacement candidate. Keep HPR comparisons, exact assembly ratings, mounting differences and US supply questions separate.</description><pubDate>Fri, 09 Oct 2026 00:00:00 GMT</pubDate></item><item><title>Questions to Ask Your EMS Partner After Jabil&apos;s Q4 FY2026 Earnings</title><link>https://magnitude-electronics.com/blog/jabil-fourth-quarter-fiscal-2026-results/</link><guid isPermaLink="true">https://magnitude-electronics.com/blog/jabil-fourth-quarter-fiscal-2026-results/</guid><description>Use Jabil’s earnings release to prepare program-level questions about EMS capacity, materials, test readiness and commitments before changing an annual plan.</description><pubDate>Fri, 09 Oct 2026 00:00:00 GMT</pubDate></item><item><title>Electronics Chemistry Site Changes: A Checklist After KYZEN&apos;s Penang News</title><link>https://magnitude-electronics.com/blog/kyzen-penang-southeast-asia-headquarters-facility/</link><guid isPermaLink="true">https://magnitude-electronics.com/blog/kyzen-penang-southeast-asia-headquarters-facility/</guid><description>Check whether a chemistry supplier’s new site affects your product. Record change scope, batch documents, process review and product-specific delivery terms.</description><pubDate>Fri, 09 Oct 2026 00:00:00 GMT</pubDate></item><item><title>C.ODC Maintenance Review: Contamination, Protective Glass and Air Purge</title><link>https://magnitude-electronics.com/blog/profilegauge-c-odc-specs/</link><guid isPermaLink="true">https://magnitude-electronics.com/blog/profilegauge-c-odc-specs/</guid><description>Record C.ODC contamination states, protective-glass identity and purge-air documentation. Keep diagnostic status separate from measurement acceptance.</description><pubDate>Fri, 09 Oct 2026 00:00:00 GMT</pubDate></item><item><title>Component Date Codes and Traceability: A Receiving Evidence Record</title><link>https://magnitude-electronics.com/blog/component-date-codes-traceability/</link><guid isPermaLink="true">https://magnitude-electronics.com/blog/component-date-codes-traceability/</guid><description>Record component date markings with manufacturer rules, batch documents and purchase records. Keep date interpretation separate from origin and acceptance decisions.</description><pubDate>Thu, 08 Oct 2026 00:00:00 GMT</pubDate></item><item><title>Component Part Numbers: Ordering Codes, Package Markings and Board References</title><link>https://magnitude-electronics.com/blog/component-part-numbers-ordering-codes-markings/</link><guid isPermaLink="true">https://magnitude-electronics.com/blog/component-part-numbers-ordering-codes-markings/</guid><description>Keep full ordering codes, package markings and board references separate in a source-linked identification record, with unresolved matches clearly documented.</description><pubDate>Thu, 08 Oct 2026 00:00:00 GMT</pubDate></item><item><title>Obsolete Component Replacement: A Review Matrix</title><link>https://magnitude-electronics.com/blog/obsolete-component-replacement-checklist/</link><guid isPermaLink="true">https://magnitude-electronics.com/blog/obsolete-component-replacement-checklist/</guid><description>Separate purchasing the same discontinued part from engineering substitution. Record lifecycle evidence, board constraints, candidate differences and review owners.</description><pubDate>Thu, 08 Oct 2026 00:00:00 GMT</pubDate></item><item><title>Packaging Machine Sensor Interfaces: Match the Detection Task to Input Documents</title><link>https://magnitude-electronics.com/blog/packaging-machine-sensor-interface-checklist/</link><guid isPermaLink="true">https://magnitude-electronics.com/blog/packaging-machine-sensor-interface-checklist/</guid><description>Turn a packaging detection task into a sensor-output and controller-input record. Preserve document conditions, configuration questions and engineering ownership.</description><pubDate>Thu, 08 Oct 2026 00:00:00 GMT</pubDate></item><item><title>How to Read a Microcontroller Datasheet: A Condition Checklist</title><link>https://magnitude-electronics.com/blog/read-microcontroller-datasheet-checklist/</link><guid isPermaLink="true">https://magnitude-electronics.com/blog/read-microcontroller-datasheet-checklist/</guid><description>Read MCU documents by device, revision, section and operating condition. Use a source-linked checklist without treating absolute maximum ratings as operating targets.</description><pubDate>Thu, 08 Oct 2026 00:00:00 GMT</pubDate></item><item><title>RS-485, CAN and Ethernet: Endpoint and Gateway Records</title><link>https://magnitude-electronics.com/blog/rs485-can-ethernet-industrial-interfaces/</link><guid isPermaLink="true">https://magnitude-electronics.com/blog/rs485-can-ethernet-industrial-interfaces/</guid><description>Separate electrical interfaces, link behavior and application meaning. Record both endpoints and the gateway function before comparing RS-485, CAN and Ethernet.</description><pubDate>Thu, 08 Oct 2026 00:00:00 GMT</pubDate></item><item><title>Self-Service Kiosk Power Supply Requirements: Record the AC and DC Boundaries</title><link>https://magnitude-electronics.com/blog/self-service-kiosk-power-supply-requirements/</link><guid isPermaLink="true">https://magnitude-electronics.com/blog/self-service-kiosk-power-supply-requirements/</guid><description>Separate complete-kiosk AC requirements from internal peripheral DC inputs. Build a document-based load record without assuming a universal power rating.</description><pubDate>Thu, 08 Oct 2026 00:00:00 GMT</pubDate></item><item><title>Unattended Control Board Maintenance: A Record for Authorized Service</title><link>https://magnitude-electronics.com/blog/unattended-control-board-maintenance-record/</link><guid isPermaLink="true">https://magnitude-electronics.com/blog/unattended-control-board-maintenance-record/</guid><description>Prepare a non-invasive service handoff for unattended equipment: identity, observations, existing logs, configuration records and access permissions.</description><pubDate>Thu, 08 Oct 2026 00:00:00 GMT</pubDate></item></channel></rss>